HAUSE Energy Better business energy decisions. Start with your bill. Canada + United States +1 587-316-6194
CommercialElectricityRates.com byHAUSE

Filed tariffs, quoted from the filing

Commercial electricity tariffs by utility

What each utility’s own filed tariff prints for its commercial schedule: the document, the schedule and the day we read it. Quoted, never estimated.

  • Utilities read16 of 38
  • Alberta distributors4
  • Last read2026-10-31

Delivery charges come from the utility’s filed tariff, whichever supplier you choose. This page lists the 16 of 38 utilities on this site whose tariff we have read and quoted, in 8 states, with the schedule, document and read date. Alberta’s 4 distributors are listed too. These are schedule figures, not bill estimates.

Source: Each utility’s own filed tariff, linked below · 2026-10-31

U.S. utilities

The delivery half of a commercial bill follows the address. The utility’s tariff sets it, a regulator approves it, and changing supplier does not change it. Select a utility to see the schedule it quotes, the figures and what is left out.

Utilities whose filed tariff is quoted on this site, with the schedule listed and the date it was read
UtilityStateSchedule quotedTariff documentRead
Pepco (District of Columbia)District of ColumbiaSchedules GS ND, GS LV and MGT LV (distribution service charges)Potomac Electric Power Company (Pepco) Electric Tariff, P.S.C. of D.C. No. 1, Rate Schedules for Electric Service in the District of Columbia, issued September 29, 2026, effective for usage on and after October 1, 2026 ↗2026-10-31
ComEdIllinoisSmall Load and Medium Load Delivery Classes (delivery charges)ComEd Schedule of Rates for Electric Service, ILL. C. C. No. 10, 2026 Ratebook, Delivery Service Charges Informational Sheet No. 64.3 effective February 28, 2025 ↗2026-10-30
Baltimore Gas and ElectricMarylandSchedule G (General Service)Baltimore Gas and Electric Company Electric Tariff, P.S.C. Md. E-6, Schedule G (General Service), Rate Year 3 rates effective January 1, 2026 ↗2026-10-30
Jersey Central Power & LightNew JerseyService Classification GS (General Service Secondary)JCP&L Electric Tariff, BPU No. 14 Electric, Part III, Service Classification GS: Sheet No. 10 effective July 15, 2026 and Sheet No. 11 effective October 1, 2026 ↗2026-10-31
PSE&GNew JerseyRate Schedule GLP (General Lighting and Power Service)PSE&G Electric Tariff, B.P.U.N.J. No. 17 Electric, Rate Schedule GLP Second Revised Sheet No. 129 effective October 1, 2026 ↗2026-10-30
Con EdisonNew YorkSC 2 Rate I (General - Small) and SC 9 Rate I (General - Large)Consolidated Edison Schedule for Electricity Service, P.S.C. No. 10 - Electricity: rates on Leaf 397 (SC 2 Rate I) and Leaf 445 (SC 9 Rate I), initial effective date 02/01/2026; the applicability and billing rules come from other leaves of the same tariff, each printing its own, earlier, effective date ↗2026-10-31
National Grid (Niagara Mohawk)New YorkSC 2 Small General Service and SC 3 Large General Service (delivery voltage 0-2.2 kV)Niagara Mohawk Power Corporation d/b/a National Grid, P.S.C. No. 220 Electricity, Service Classifications No. 2 and No. 3: rate Leaves 370, 371 and 379, initial effective date April 1, 2026; demand and applicability rules on Leaves 372, 378 and 381, initial effective dates September 1, 2025, February 1, 2026 and March 1, 2026 ↗2026-10-31
AEP OhioOhioSchedules GS-NDM (General Service - Non-Demand Metered) and GS (General Service)Ohio Power Company (AEP Ohio) Electric Tariff, P.U.C.O. No. 22, Schedules GS-NDM and GS (Original Sheet Nos. 220-1 to 220-5), effective April 10, 2026 ↗2026-10-31
Duke Energy OhioOhioRate DS (Service at Secondary Distribution Voltage)Duke Energy Ohio Electric Tariff, P.U.C.O. Electric No. 19, Sheet No. 40.19 (Rate DS), effective January 3, 2023 ↗2026-10-31
PECO EnergyPennsylvaniaRate GS (General Service)PECO Electric Service Tariff, Pa. P.U.C. No. 8, Supplement No. 37, effective October 1, 2026 ↗2026-10-29
PPL Electric UtilitiesPennsylvaniaRate Schedules GS-1 (Single Phase General Service) and GS-3 (Three Phase General Service), at secondary voltagePPL Electric Utilities General Tariff, Electric Pa. P.U.C. No. 202, Supplement No. 4, effective October 1, 2026 (the GS-1 and GS-3 pages are effective July 1, 2026) ↗2026-10-30
AEP Texas CentralTexasSecondary Voltage Service Greater Than 10 kW (with Secondary Voltage Service Less Than or Equal to 10 kW)AEP Texas Tariff for Retail Delivery Service, Chapter 6 Section 6.1.1 (Revision: First), Effective Date: Bills Rendered on or after October 1, 2024 ↗2026-10-30
AEP Texas NorthTexasSecondary Voltage Service Greater Than 10 kW (with Secondary Voltage Service Less Than or Equal to 10 kW)AEP Texas Tariff for Retail Delivery Service, Chapter 6 Section 6.1.1 (Revision: First), Effective Date: Bills Rendered on or after October 1, 2024 ↗2026-10-30
CenterPoint Energy Houston ElectricTexasSecondary Service Greater Than 10 kVA (with Secondary Service Less Than or Equal to 10 kVA)CenterPoint Energy Houston Electric Tariff for Retail Delivery Service, Sheets 6.2 and 6.3 (Revision Number 23rd), Effective 02/26/26 ↗2026-10-30
Oncor Electric DeliveryTexasSecondary Service Greater Than 10 kW (with Secondary Service Less Than or Equal to 10 kW)Oncor Electric Delivery Tariff for Retail Delivery Service, Revision Twenty-Two; Secondary Service sheets 1.2 and 1.3, Revision Twelve, effective June 1, 2026 ↗2026-10-30
Texas-New Mexico PowerTexasSecondary Service (Greater Than 5 kW) (with Secondary Service (Less Than or Equal to 5 kW))TNMP Tariff for Retail Delivery Service, 6.1 Rate Schedules (Revision 14), Effective Date: September 13, 2026 ↗2026-10-30

Alberta

Alberta’s distributors file tariffs by rate class, and the delivery charges follow the distributor, not the retailer. The rows are in the Alberta business guide, in Canadian dollars.

How to use a tariff row

  • Find the schedule code on the bill first. A utility has many schedules, and the one on the bill decides which row applies.
  • Read the units. A fixed charge is per month or per day, an energy charge is per kWh, a demand charge is per kW or per kVA, and a utility may print the same class in different units from another.
  • Remember what is not there. Riders, supply, transmission pass-throughs, taxes and local fees are billed on top, and each page says which it leaves out.
  • Check the date. Tariffs change by filing. Each row carries the day it was read, and is withdrawn from this site after the last day we vouch for it, until it is read again.

The ideas behind the lines are in supply versus delivery, ratchet clauses and load factor.

Not read yet

22 utilities on this site have a page but no tariff rows. Their pages say so, and they link the same tools:

Common questions

Where can I find my utility’s commercial rate schedule?
In the utility’s filed tariff, which the utility or its regulator publishes. The bill prints the rate schedule code, and the tariff lists what that schedule charges. This page links the tariff documents we have read, and each utility page says which schedule it quotes.
Does this page tell me what my bill will be?
No. It quotes schedule figures as the tariff prints them. A bill also carries riders, supply charges, taxes and fees that depend on the account, so the figures here are context for reading a bill, not an estimate of one.
Why are some utilities missing?
A tariff is quoted only after it has been read and every quoted figure checked against the document. 22 of the 38 utilities on this site have not been read yet, and their pages say so rather than guessing.
Get a free bill check

A tariff row tells you what a schedule charges. Your bill tells you which schedule you are on and what you actually pay. Nobody calls unless you ask.